BLZF Started the Fundation Stone Laying of Ninghe Industrial Base

The foundation stone laying ceremony of Ninghe industrial base of BLZF, located at Ninghe Industrial Park was held at 8:58, July 12, 2012 in the exultant sound of Gun Salute.

 

Mr Li Zemin, Member of standing committee and vice subprefect, Mr Li Runde, vicesubprefect, Mr Wangzhuo vice chairman of the CPPCC, Mr Zhao Xiaohu, president of DUNAN Valve Industry, Mr Wang Jianbiao, general manager, Mr Yangyu,president of BLZF, Mr Jiang Wei geneeral manager and hornored guests attended the ceremony, and ridged for the foundation stone laying of project.

 

Ninghe Industrial Base of BLZF group covers 120000 square meters with expected investment of one billion RMB and shall be finished at the end of 2012.

 

BLZFgroup will become a largest- scale industrial base of oil equipment and highlevel valves in North of China integrated with D&R, manufacture, test andinspection and service. The base is equipped with oil equipment, valve researchinstitute, oil equipment and valve test center, marketing center, and more orless 1000 sets of kinds of large and medium-sized professional machiningequipments, offering more than 1000 jobs. Sales income is expected to be morethan 5 billion USD.

Return list